We have had a great week – super productive and even had time for the beach at San Fabian. We can see the sea from our farm, it’s about 3 km away but by road it takes 30 minutes seeing we have to drive the long way around. We enjoyed resting and collecting some seaweed for our compost.

a-Photo0332

Ken Kai exhausted!

a-kyra-seaweed

Minda and Myra collecting seaweed

a-Photo0333

David resting

a-Photo0341

Young boy at the beach

a-Photo0324

Centre beach San Fabian

 

 

 

 

 

 

 

 

 

 

 

We completed a number of tree and plant projects around the farm. Most of our trees have not been cared for now for over 3 months seeing our full time person Minda had an accident at home so could not work. With us resident now we can catch up on things.

Photo0356

Cashew’s composted and staked

Enclosed vegi plot dug out

Enclosed vegi plot dug out

 

 

 

 

 

 

We dug out the enclosed vegi plot so we can now plant salad vegi’s while keeping the chickens at bay a little with the fence.

Photo0372

Bamboo stack created

Even simple things like stacking up bamboo takes a lot of time here. In the heat it can make a simple task a bit more challenging that is why we try to work with the cycle of the day – starting early and then stopping around 11am and then continuing once it has cooled off around 3pm. By 3:30pm the temperatures can drop 8 degrees with the cool afternoon sea breeze and the sun starting to get covered by the trees.